Seattle Times article on the final SR-520 Evergreen Floating Bridge Precast Deck Panels manufactured by Belarde being installed – Road-deck milestone for new 520 bridge

Dave Becher, director of construction for highway 520, center, and Greg Meadows, right, construction manager for highway 520, walk on the new pontoons of the new bridge. The actual hiway is above.

Dave Becher, director of construction for highway 520, center, and Greg Meadows, right, construction manager for highway 520, walk on the new pontoons of the new bridge. The actual highway is above.